 2011 Level Up - Level up patching on Old 81 - Crews place Type D hot mix on selected roads to improve the cross slope. It is important that preliminary work is performed before the final surfacing is placed in the summer months. The road is marked where the rough areas are then trucks deliver the 300 degree asphalt mix. The blade smoothes the piles and the roller compacts the thin lift before it cools.  

 level asmllevel bsml

2012 Fox Rd - Road and Bridge crews removed and constructed a new concrete box culvert in Precinct 2.  The old concrete culvert was old and delaminating.  Right-of-way was purchased on one side and the roadway was widened during the construction.  Photos show stages of the construction performed by the Bridge Crew and the Construction Crew.

Fox   a

Fox2012Fox3