2017 Highlights of the Year
Seaton Road Bridge widening- widen a 20' wide concrete pan girder bridge to 30' wide. Bridge was widened and rail was installed. Bridge was 120 feet long.
2014 Highlights of the Year
Indian Creek Culvert- Total rehab and installation of 8'x 6'-3 barrel culvert
Cen-Tex Loop Culvert- Total rehab and installation of 8' x 6' '- 3 barrel culvert
Donahoe Road Culvert- installation of 4- 8'x8'x28' box culvert
Camp Creek Road- Rehab and construct new roadway section.
Indian Creek Road- Rehab and construct new roadway section.
Lutheran Church Road- Rehab and construct new roadway section.
Harber Road- Rehab and construct new roadway section.
2012 Fox Rd - Road and Bridge crews removed and constructed a new concrete box culvert in Precinct 2. The old concrete culvert was old and delaminating. Right-of-way was purchased on one side and the roadway was widened during the construction. Photos show stages of the construction performed by the Bridge Crew and the Construction Crew.