The Bell County
Road & Bridge Department is responsible for building and maintaining a
network of roads and bridges in unincorporated areas of the county.
The Federal Government is responsible for major interstates (I-35) and
highways such as US 190; the State of Texas is responsible for other major
highways and farm-to-market roads; and local Cities are responsible for
the roads within their city limits.
|
|
The Road and Bridge Department is
located at 702 W. Avenue O in Belton, Texas. Office hours are Monday
- Friday, 8:00 am to 4:30 pm. In case of an emergency outside of
regular office hours, contact the Bell County Sheriff's Department at
(254) 933-5400.
|
|
2011 Annual Work Plan |
The Road and Bridge 2011 Annual
Work Plan lists the Project Name, Scope and Length of the project, as well
as the cost of the materials per project. The information is in
order by Precinct 1 through Precinct 4.
|
|
2011
Annual Work Plan |
 |
|
The
above document is a ".PDF" file which can be
read with the Adobe Acrobat Reader. If you have this program, just
click on the link. If you need a copy of Acrobat Reader, click on
the Acrobat Reader button.
|
2011 Seal Coat Plan |
|
2011
Seal Coat Plan |
 |
|
The
above documents are in ".PDF" files which can be
read with the Adobe Acrobat Reader. If you have this program, just
click on the link. If you need a copy of Acrobat Reader, click on
the Acrobat Reader button.
|
Project Photos |
2011 Level Up -
The asphalt crew prepares roads for the upcoming seal coat program.
Zipper
Rehabilitation - The construction crew pulverizes and
rebuilds sections on Bobwhite Road.
2010 Seal Coating - Bell County Asphalt and Trucking
crews will seal coat 121 miles of roads this year. Work began in May
and will conclude in September.
2010
Durapatching
- The Asphalt Crew performs durapatching during the winter and spring to
prepare for the summer seal coat program. Durapatching is surface
maintenance using a mobile seal coating trailer.
Cracksealing
- A cracksealing machine is used throughout the year to seal the cracks in
our roads caused by the infiltration of water into the pavement.
The cracks are cleared by air pressure and the hot sealant is placed in
the crack with a wand. This important activity prevents further
deterioration of the pavement.
Jack Rabbit Road
- The Maintenance Crew replaced a failed culvert by excavating and
installing replacement pipes under the road. The Gradall, track
loader, and backhoe were required to place the new pipes in a 10' fill.
Falls Road - New Bridge Construction - Info: Falls Road @
North Elm Creek - New Bridge Construction - Precinct 3 (3 - 30' spans, pan
girder bridge)
.
|
|