Construction Updates

 Road Construction

Old Howard Road, Pct 3- Full depth pavement rehabilitation of 10250' of roadway. Pulverize existing roadbed 10" deep and mix with soil stabilizer, add 7" flexible base material, prime and seal surface with chip seal.  Widen on box culvert.